THE PROJECT
The Geraldton No.2 Wastewater Treatment Plant is licensed to treat up to 3.5 ML/d of waste-water.
In 2015-17, about 1.9 ML/d were being treated and infiltrated to the Tamala Limestone, part of the Surficial Aquifer. Up to 900 KL/d of the infiltrated wastewater were extracted by bore A1-97 and used to supply third-parties with water for irrigation.