The Southdown Joint Venture is planning to mine the Southdown magnetite deposit, located nearby to Wellstead, about 90 km north-east of Albany. The total mineral resource at Southdown is currently 1.25 Bt at 33.7 % Davis Tube Recovery.
At a mining rate of 5 Mtpa, it is estimated that up to 120 L/s of saline water will be required during the mine construction phase, and that up 110 L/s of fresh water will be required for ore processing and the operation of a slurry pipeline to Albany during the mine operation phase.
The main options for obtaining the water are a desalination plant at Cape Riche and/or sedimentary aquifers within sub-basins of the Bremer Basin between Albany and Wellstead.